Experiments › Physics and Renewable Energy

How good is your solar panel?

Fill Factor

Grades 7-8Physics and Renewable Energy1 version

A guided experiment in the Stemious app: students read it first, run it at the bench with the sensors listed below, and their data and conclusions are saved to their record. The first steps are below in View mode; the full lab is in the app.

Try it in View mode

Alpha: being verified by teachers

This is how the lab opens in the Stemious app: the first 5 of its 8 steps. To run it with the sensors, record data and take the quiz, students use the app.

Rooftop solar panels glowing under sunlight with an electrical circuit diagram overlay

Wonder

Can a solar panel deliver its top voltage and top current at the same time?

Show the answer

No! When voltage is at its highest, zero current flows. To get power, engineers look for the sweet spot in between called the fill factor.

A small solar panel angled toward the sun powering a tiny electric fan

Introduction

How Good Is Your Solar Panel?

Solar panels convert light directly into electricity. But if you connect a panel with no appliance attached, it produces top voltage and zero current. If you connect its wires directly together, it produces top current and zero voltage! Neither situation delivers any electrical power to your phone or home. In this experiment, you will dial through different electrical resistances to map out the entire current-voltage curve. Then you will find the hidden peak power point and calculate the fill factor: the true mark of solar panel quality.

Driving question: Why do two solar panels with the same voltage rating produce different amounts of usable power?

What you will learn

Today you will find out

  • I can measure the highest voltage and highest current of a solar panel.
  • I can wire variable loads to test both high and low resistance points.
  • I can find the peak power point on a solar panel graph.
  • I can explain how fill factor tells engineers the quality of a solar cell.
  • I can explain why solar engineers test panels before putting them on roofs or satellites.

Why it matters: Solar engineers rely on fill factor to weed out damaged cells and squeeze maximum energy from every ray of sunlight.

Safety first

Lab Rules for Solar Testing

  • Wear safety goggles. Keep light sources and wires organized.
  • Purple gloves = teacher does it. Blue gloves = you do it.
  • Never look directly into the sun or into high-intensity halogen lamps.
  • Halogen work lamps get very hot. Keep hands at least 20 cm away from lamp bulbs.
  • Check alligator clips before you connect them. Make sure wires do not short-circuit accidentally against metal tables.
  • Keep all drinks and liquids away from the sensors and variable load boxes.

What you need

  • Go Direct Energy Sensor1
  • Vernier Variable Load2
  • KidWind 2 V solar panel1
  • electrical wire with alligator clips2
  • Tablet running Graphical Analysis1
  • safety goggles1 per student
Close-up of sliding switch on Go Direct Energy Sensor to External Load

Step 1 of 8

Set the Energy Sensor to External Load

  1. Slide the switch on the Go Direct Energy Sensor front panel to External Load.
  2. Start Graphical Analysis on your tablet or computer. Turn on the sensor. Connect with Bluetooth.
  3. Set Mode to Event Based (Selected Events), with Current on the y-axis and Potential on the x-axis.
Stop and check
  • The sensor battery is charged.
  • The switch is moved completely to External Load, not Internal 30 Ohm.

Careful: If you leave the switch on Internal 30 Ohm, the variable load boxes cannot control the circuit. Make sure that the switch points clearly to External Load.

Connecting solar panel red and black wires to the Energy Sensor Source terminals

Step 2 of 8

Connect solar panel to Source terminals

  1. Connect the red solar panel wire to the red (+) Source terminal wire on the sensor.
  2. Connect the black solar panel wire to the black (-) Source terminal wire.
  3. Point the solar panel directly toward the sun or your steady lamp.
Stop and check
  • Red connects to red (+), black connects to black (-).
  • No wires touch the Load terminals yet.
  • Leave the Load terminals completely empty for now.

Careful: If you reverse the wires, the graph shows negative voltage readings. Match red clip to red terminal and black clip to black terminal.

Solar panel angled toward light with open load terminals, reading peak voltage on tablet

Step 3 of 8

Record open-circuit voltage (VOC)

  1. Point the solar panel directly at your light source and prop it firmly in place.
  2. Tap Collect to start data collection.
  3. Tap Keep to store this first point as open-circuit voltage (VOC).
Stop and check
  • No shadow falls on any part of the solar cells.
  • The panel will not wobble or tilt between measurements.
  • Make sure no wires are connected to the Load terminals.

Careful: If you shade one solar cell accidentally, the voltage drops dramatically. Stand to the side so your body does not cast a shadow over the panel.

Two variable loads connected in series with jumper wire to the Energy Sensor

Step 4 of 8

Wire two Vernier Variable Loads in series

  1. Wire the red Load terminal to the red post on Variable Load 1.
  2. Use a jumper wire to connect the black post of Load 1 to the red post of Load 2.
  3. Connect the black post of Load 2 back to the black Load terminal of the sensor.
Stop and check
  • Follow the series loop carefully from sensor to Load 1, Load 2, and back.
  • Both knobs are rotated fully clockwise.
  • Turn both dials fully clockwise to reach maximum combined resistance (over 500 ohms).

Careful: A loose alligator clip opens the circuit so no current flows through the loads. Pinch each alligator clip firmly onto the metal terminal posts.

Student hand turning variable load knob counterclockwise while watching tablet graph

Step 5 of 8

Collect data across high resistances

  1. Tap Keep in Graphical Analysis to record the highest resistance point.
  2. Turn the knob of one Variable Load slightly counterclockwise until current rises by 15 to 30 mA.
  3. Adjust knobs counterclockwise until both dials are fully counterclockwise. Tap Keep at each step.
Stop and check
  • Let the readings stabilize for 3 seconds before you tap Keep.
  • Do not lean over the solar panel while you turn the dials.

Careful: If you turn the knob too fast, data points bunch up or skip the curve knee. Turn the dial in small quarter-turn nudges.

3 more steps, then data, observations, conclusions and a quiz

The full lab is free for teachers. Tell us where to send it and we will share it, along with the app for your students.

Get the full lab, free for teachers

Where it fits in the syllabus

CBSE (NCERT)
  • Related Class 12, Physics, chapter 6: Semiconductor Electronics: Materials, Devices and Simple Circuits

Versions and what each needs

Vernier instruments are designed for education and are not intended for industrial, medical or commercial testing.